dc.contributor.author | Hurtado Esquivel, Oscar | |
dc.date.accessioned | 2024-12-23T18:46:03Z | |
dc.date.available | 2024-12-23T18:46:03Z | |
dc.date.issued | 2024-12-19 | |
dc.date.submitted | 2024-12-19 | |
dc.identifier.citation | Hurtado, O. (2024). Plan de Gestión del Proyecto de Rehabilitación de las Presas Mancotal, Presa El Dorado y Presa El Salto. Universidad Latinoamericana de Ciencia y Tecnología | es_ES |
dc.identifier.uri | https://hdl.handle.net/20.500.14230/11581 | |
dc.description.abstract | Resumen
El proyecto de rehabilitación de las presas Mancotal, El Dorado y El Salto, liderado por la Empresa Nicaragüense de Electricidad (ENEL), surge como una respuesta crítica a los problemas identificados en el deterioro estructural de estas infraestructuras y la ausencia de sistemas efectivos de monitoreo continuo, esenciales para garantizar la seguridad hídrica y estructural. Con el objetivo de implementar soluciones que aseguren la durabilidad y operatividad a largo plazo, se desarrolló un plan de gestión para la implementación de un sistema de monitoreo avanzado provisto por Campbell Scientific, que incluye sensores piezométricos y acelerográficos de alta precisión. Este sistema, capaz de capturar y analizar datos en tiempo real, contribuye a mejorar la capacidad de respuesta ante eventos críticos, optimiza los costos de mantenimiento preventivo y correctivo, y asegura el cumplimiento de normativas de seguridad y medioambientales vigentes. La gestión utilizada abarcó una planificación detallada, que incluyó la evaluación del estado inicial de las presas, la selección y personalización de equipos, la instalación técnica por parte de expertos y la capacitación de los operadores de ENEL, lo que permite garantizar la sostenibilidad y autonomía operativa del sistema. Los principales resultados obtenidos destacan la mejora en la capacidad de monitoreo, una reducción significativa en los tiempos de reacción ante emergencias y una infraestructura más segura y eficiente. De manera de conclusiones, el proyecto demostró ser una solución efectiva y replicable para otras infraestructuras críticas, mientras que entre las recomendaciones principales se sugiere la implementación de auditorías periódicas, programas de mantenimiento preventivo robustos y capacitaciones continuas para los operadores, se asegura la adaptabilidad del sistema frente a futuros desafíos tecnológicos y medioambientales. | es_ES |
dc.description.abstract | Abstract
The rehabilitation project for the Mancotal, El Dorado and El Salto dams, implemented by the Nicaraguan Electricity Company (ENEL), is a critical response to the problems identified in the structural deterioration of these infrastructures and the absence of effective continuous monitoring systems, essential to guarantee water and structural safety. In order to implement solutions that ensure long-term durability and operability, a management plan was developed for the implementation of an advanced monitoring system provided by Campbell Scientific, which includes high precision piezometric and accelerograph sensors. This system, capable of capturing and analyzing data in real time, contributes to improve the capacity to respond to critical events, optimizes preventive and corrective maintenance costs, and ensures compliance with current safety and environmental regulations. The management used involved detailed planning, which included the evaluation of the initial state of the dams, the selection and customization of equipment, technical installation by experts and training of ENEL operators, thus guaranteeing the sustainability and operational autonomy of the system. The main results obtained include improved monitoring capacity, a significant reduction in emergency response times, and a safer and more efficient infrastructure. As conclusions, the project proved to be an effective and replicable solution for other critical infrastructures, while among the main recommendations it is suggested the implementation of periodic audits, robust preventive maintenance programs and continuous training for operators, ensuring the adaptability of the system to future technological and environmental challenges. | es_ES |
dc.format.extent | 59 | |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | spa | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.title | Plan de Gestión del Proyecto de Rehabilitación de las Presas Mancotal, Presa El Dorado y Presa El Salto | es_ES |
dc.title.alternative | Project Management Plan for the Rehabilitation of the Mantocal, El Dorado and El Salto Dams | es_ES |
datacite.rights | http://purl.org/coar/access_right/c_abf2 | es_ES |
oaire.resourcetype | Paper | es_ES |
oaire.version | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | es_ES |
dc.rights.cc | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.subject.keywords | Proyecto, ciclo de vida de un proyecto, Kanban, salud de presas, instrumentación de presas. | es_ES |
dc.type.hasversion | info:eu-repo/semantics/restrictedAccess | es_ES |